Eliminate Rainy Season Road Failures - Keep Your Mining Operations Running 24/7

Revolutionary soil stabilization technology that creates waterproof roads lasting 15+ years - at 30% less than asphalt

0
% Cost Savings vs Asphalt
0
Year Warranty
0
Week Installation
0
Maintenance Required
ISO 9001
CE Mark
100+ Projects Worldwide

Your Mining Operations Lose Millions During Rainy Season

Traditional roads fail when you need them most, causing massive operational losses

Deep water-filled pothole on mining road

Production Delays

$50,000-200,000 lost per shutdown day when roads become impassable during rainy season

Mining vehicle stuck in mud on damaged road

Maintenance Nightmare

Asphalt roads need complete reconstruction every 2-3 years, draining maintenance budgets

Severe road erosion damage from heavy rainfall

Safety Risks

Vehicle accidents increase 300% on damaged roads, putting workers and equipment at risk

Ghana Gold Mine lost $2.4M in Q2 2023 due to road washouts.

See how we solved it

Wibari Technology: Build Once, Forget Maintenance

Revolutionary soil stabilization that transforms any road into a waterproof, load-bearing surface

Original Soil
Stabilized Layer (150-300mm)
Compacted Subgrade

Waterproof Foundation

Proprietary 2-component catalyst creates an impermeable layer that prevents water penetration even in 4,000mm annual rainfall areas.

  • Chemical bonding strengthens soil structure
  • Zero water absorption after treatment
  • Works with any soil type
400-ton mining truck on stabilized road

Superior Strength

Engineered to handle 400+ ton mining equipment while actually getting stronger with traffic over time.

  • California Bearing Ratio (CBR) 300% improvement
  • Load distribution prevents rutting
  • Self-compacting under traffic
Road construction equipment and crew working

Rapid Deployment

Industry-leading 2,000 m² per day productivity with immediate traffic use after completion.

  • No curing time required
  • Standard construction equipment
  • Local workforce training included

From Assessment to Operational Road in 14 Days

Our proven 4-stage process ensures optimal results and maximum cost savings

1
Engineers conducting soil testing with specialized equipment

Site Assessment (Days 1-3)

Comprehensive soil analysis and testing to determine optimal catalyst mix and identify cost-saving opportunities.

Deliverable: Detailed project proposal with guaranteed pricing
2
Engineering blueprints and technical calculations

Load Analysis (Days 4-6)

Determine vehicle weights and frequency to design bearing capacity specifications optimized for your operations.

Deliverable: Engineering specifications report
3
Aerial drone view of mining site construction planning

Strategic Planning (Days 7-11)

Map critical reinforcement zones while skipping naturally elevated areas to achieve 30-40% cost optimization.

Deliverable: Construction blueprint with cost optimization plan
4
Professional construction crew implementing road stabilization

Expert Implementation (Days 12-14)

Deploy certified engineers, train local workforce, and execute with precision to deliver your operational road.

Deliverable: Completed road with 15-year warranty certificate

See Your 15-Year Savings

Calculate your exact ROI and cost savings with our interactive calculator

Project Details

5 km

Your Savings Analysis

$1,330,000
Total 15-Year Savings
Metric
Current Cost
Wibari Solution
Initial Cost
$350,000
$245,000
15-Year Maintenance
$1,225,000
$0
Total Cost
$1,575,000
$245,000
543% ROI
2.8 Years Payback

Success Across African Mining Operations

Real results from mining companies who transformed their operations

Nigerian oil field access roads with industrial infrastructure
Oil & Gas

Nigerian Oil & Gas Access Roads

Challenge: 8-month rainy season causing $9B annual flood damage

Solution: 45km reinforced access roads

$4.2M Saved Annually
Zero Weather Shutdowns
DRC copper mine with haul trucks on reinforced roads
Copper Mining

DRC Copper Mine Haul Roads

Challenge: 35-day transport delays during rains

Solution: 12km primary haul road stabilization

24/7 Operations
40% Transport Cost Reduction
Ghana gold mining operation with improved road network
Gold Mining

Ghana Gold Mine Infrastructure

Challenge: Repeated washouts, environmental violations

Solution: Complete road network upgrade

100% Uptime
Full Compliance Achieved

Verified Returns from Real Mining Operations

Data-driven results that speak for themselves

543%
Average ROI over 15 years
2.8
Years average payback period
$200K
Saved per avoided shutdown day
$1M+
Maintenance savings over 15 years

"Wibari saved us $3.2M in the first year alone. No more weather delays."

John Mukasa COO, East African Mining Corp

"15 months in, zero maintenance. Roads actually getting stronger."

Sarah Okonkwo Infrastructure Director, Nigerian Minerals

"Transport time cut by 40%. Best infrastructure investment we've made."

Pierre Kabongo Operations Manager, DRC Copper

Sustainable Mining Infrastructure

Reduce your environmental impact while improving performance

60%
Less CO₂

Uses existing soil, eliminates material transport emissions

Zero
Chemical Runoff

Environmentally neutral composition, safe for groundwater

Reduced
Erosion

Prevents sediment in water systems, maintains ecosystem

15%
Lower Fuel Use

Smooth surfaces reduce vehicle fuel consumption

Environmental Impact Assessment Approved

Common Questions from Mining Operations

Get answers to the most frequently asked questions

How does it handle 400-ton mining trucks?

Our stabilized roads are engineered specifically for heavy mining equipment. The chemical bonding process increases the California Bearing Ratio (CBR) by 300%, creating a load-bearing surface that actually gets stronger with traffic. We've successfully handled everything from 400-ton haul trucks to tracked excavators without any surface damage.

What happens in extreme rainfall (4,000mm+)?

Our technology creates an impermeable layer with 0.001% permeability - essentially waterproof. Even in areas with 4,000mm+ annual rainfall like parts of West Africa, our roads maintain structural integrity. The stabilized layer prevents water penetration that causes traditional road failures.

Can you work with our existing contractors?

Absolutely. We provide comprehensive training to your existing contractors and can work as a technology partner. Our process uses standard construction equipment, and we provide detailed specifications and on-site training to ensure proper implementation.

How do you guarantee 15 years?

Our 15-year warranty is backed by extensive testing and 100+ successful projects. We provide performance bonds and have a proven track record. Our oldest installations from 2008 are still performing excellently, which gives us confidence in our warranty terms.

What about expansion joints and drainage?

Unlike rigid concrete, our stabilized roads have natural flexibility that eliminates the need for expansion joints. For drainage, we integrate with your existing systems and can improve water management by creating controlled runoff patterns.

Is it compatible with our environmental permits?

Yes, our technology is environmentally neutral and actually improves compliance. We reduce erosion, eliminate chemical runoff, and have approved Environmental Impact Assessments. Many clients use our roads to meet or exceed environmental requirements.

Stop Losing Money to Weather Delays

Get your free assessment and start saving immediately

Free Assessment Package

$5,000 Value
  • Complete site assessment
  • Soil analysis and testing
  • Custom engineering proposal
  • ROI calculation report
  • No obligation

Pilot Project Special

50% Discount
  • 50% discount on first project
  • Full warranty included
  • Success metrics guarantee
  • Reference site for your region
  • Local team training

Get Your Free Assessment